
Sewer main from Giardina Gallotti to the Montaperto treatment plant
Project data
- Client
- AICA – Agrigento municipal water utility
- Location
- Agrigento
- Period
- 2025
- Funding
- Integrated water service
- Services
- Feasibility design, aerial photogrammetric survey, multi-agency consents, land acquisition plan
- Value
- € 3.188.344
- Sector
- Water networks, sewerage and treatment
Description
The village of Giardina Gallotti has no treatment plant and currently discharges into natural gullies. The project builds a main of about 4.5 km to the Montaperto plant, which already has capacity for the flows.
The route was defined on a terrain model produced from a drone survey and point cloud, resolving clashes with the gas network and land constraints through multi-agency consents, with preliminary archaeological assessment, geological and geotechnical reports and a land acquisition plan.

