
Stormwater management in Contrada Zotta
Project data
- Client
- Municipality of Barrafranca
- Location
- Barrafranca (EN)
- Period
- 2023 – 2026
- Funding
- PNRR – hydrogeological risk mitigation
- Services
- Feasibility, detailed design, works supervision, safety coordination, design variation
- Value
- € 983.295
- Sector
- Hydraulics and land protection
Description
Along the former S.P. 42 road, east of the town, hillside runoff flooded the carriageway and the plots below. The project reorganises stormwater collection and discharge and restores the existing channels.
Rebuilding handled the full cycle: drone survey, feasibility design, verified detailed design, land acquisition, works supervision and safety coordination, through to a design variation during construction.


